Project: Construction of a new press facility for a luxury car manufacturer
Client: Not disclosed
Main Contractor: McLaughlin & Harvey - total project value not disclosed
SG Civil Engineering Ltd contract value: £7.1M
Duration: 70 weeks
Scope of works:
- Attenuation tank installation
- Surface and foul water drainage installed
- Foundations for new steel frame building 12500sqm
- Mushroom pile heads installed to carry the new floor slab
- 12000m3 excavation for new basement
- Voltex waterproofing and secondary Cementaid waterproof concrete to basement slab and walls
- Insitu soffit Formwork
- All rebar
- Construction of a three storey concrete frame scrap building
- External roads
- Hard and soft landscaping
- Sprinkler tank bases
- Service trench works
- New floor slabs within the existing facility
- Link corridor construction works and associated new roadways
- Temporary logistics building